
Pilgrims on the road and friends along the way send me changes every day, and they go out the same day. The Camino to Finisterre and Muxía app carries all of it offline, and it's still being built — new features arrive routinely.
Get the appTomorrow from The Great Divide
Nothing says you have to stop here, or there. These are simply the towns within a comfortable day's walk, so you can decide tonight.
| Town | km from here | Shared | Private | The walk |
|---|---|---|---|---|
| Cee | 12.9 | ✓ Yes | ✓ Yes | |
| Corcubión | 14.6 | — No | ✓ Yes | |
| San Roque | 16.3 | ✓ Yes | — No | |
| A Amarela | 17.0 | ✓ Yes | ✓ Yes | |
| Estorde | 18.4 | — No | ✓ Yes | |
| Sardiñeiro | 19.5 | — No | ✓ Yes | |
| Finisterre - Fisterra | 25.6 | ✓ Yes | ✓ Yes |
Shortly after Hospital, in the middle of a large roundabout, a double mojon marks the choice between Finisterre and Muxia. This is where the two routes diverge.
Left takes you to Finisterre -- roughly 30 km, descending dramatically from the highlands to the coast at Cee, then following the shoreline to the end of the world. Right takes you to Muxia -- roughly 30 km through quieter inland territory, arriving at the Atlantic sanctuary from above.
Most pilgrims walk both, either as an out-and-back from Finisterre or as a loop connecting the two. The connecting route between Finisterre and Muxia is roughly 29 km and runs along the Costa da Morte.
From the roundabout with the twin markers, take the paved road to the left and alongside the massive factory. The camino follows the road for 300m before leaving it to join a trail on your right. IF you are headed to Finisterra from this point, all the way to the first building in Cee, the camino remains well isolated from the road and any form of development beyond the two chapels mentioned below.

Esta entidad ha sido beneficiaria de una ayuda del Programa de incentivos a la movilidad eficiente y sostenible (MOVES III), gestionado por la Xunta de Galicia a través del Instituto Enerxético de Galicia (INEGA) en el marco del Real Decreto 266/2021, y cofinanciada por la Unión Europea — NextGenerationEU, dentro del Plan de Recuperación, Transformación y Resiliencia.