Scenic view of Puente de Marnel on the Camino Portugués

Camino Portugués App

Pilgrims on the road and friends along the way send me changes every day, and they go out the same day. The Camino Portugués app carries all of it offline, and it's still being built — new features arrive routinely.

Get the app

Tomorrow from Puente de Marnel

Towns with beds within a day's walk of Puente de Marnel

Nothing says you have to stop here, or there. These are simply the towns within a comfortable day's walk, so you can decide tonight.

Townkm from hereSharedPrivateThe walk
Albergaria A Velha7.8✓ Yes✓ Yes
Albergaria A Nova14.9✓ Yes✓ Yes
Branca17.4✓ Yes— No
Pinheiro da Bemposta20.1✓ Yes✓ Yes
Oliveira de Azeméis27.7✓ Yes✓ Yes
Vila de Cucujães33.5✓ Yes✓ Yes

The bridge here dates from Roman times and crosses a section of the river that's been turned into a small reservoir by the N1 embankment. In the early morning light, it's a genuinely beautiful sight — two small islands with picnic tables sit in the middle. One of the more photogenic spots between Coimbra and Porto.

The Camino:

After crossing the bridge turn to your left and go back under the N1 into Lamas.

Questions about Puente de Marnel

How far is Puente de Marnel from Mourisca?
Puente de Marnel is 3.6 km on from Mourisca, the previous town with beds. The next one, Albergaria A Velha, is 7.8 km further.
Where can I walk to tomorrow from Puente de Marnel?
Within a normal day's walk, 15 to 32 km, the towns with beds are Branca (17.4 km), Pinheiro da Bemposta (20.1 km), Oliveira de Azeméis (27.7 km).
Programa MOVES IIIMinisterio para la Transición Ecológica y el Reto Demográfico — IDAEXunta de GaliciaInstituto Enerxético de Galicia (INEGA)Financiado por la Unión Europea — NextGenerationEUPlan de Recuperación, Transformación y Resiliencia

Esta entidad ha sido beneficiaria de una ayuda del Programa de incentivos a la movilidad eficiente y sostenible (MOVES III), gestionado por la Xunta de Galicia a través del Instituto Enerxético de Galicia (INEGA) en el marco del Real Decreto 266/2021, y cofinanciada por la Unión Europea — NextGenerationEU, dentro del Plan de Recuperación, Transformación y Resiliencia.

Más información sobre la financiación recibida →